Fa
Home/Projects/In Water Domain/Darrehzar Water and Tailings Management Facility Project
Loading the player ...

Darrehzar Water and Tailings Management Facility Project

Subject of the Contract:
Construction of water and tailings management facilities in Darrehzar copper concentration plant and implementation of flotation feed pipeline


Employer: Zone Industry Company
Consultant: Middle-East Ab-Mohit Consulting Engineers Company
Contractor: Saabniroo
Duration of Contract: 24 months
Project location: Kerman Province - Sarcheshme City



Project Description:
- Return water pumping station: includes Four 1.6MW pumps with a head of 567 meters and a flow rate of 727 cubic meters per hour and Three return water pumps with a head of 146 meters and a flow rate of 160 cubic meters per hour
- Raw water station: including Two pumps with a head of 366 meters and a flow rate of 96 cubic meters per hour
- Two return water tanks each 25000 cubic meters and One raw water tank 11000 cubic meters and One fire water tank 1000 cubic meters
- Concentrate fluid transmission line with a length of 9 km with pressure of 56 bar with size of 750 mm carbon steel and two tanks with stirring mixers at the beginning and end of the line and related equipment
- Return water transmission line with a length of 11 km with size of 750 mm carbon steel
- Raw water transmission pipeline with a length of 14 km with size of 300 mm and 250 mm carbon steel
- Water transmission line with a length of 4 km with size of 800 mm and pressure of 16 bar of polyethylene
- Screen box building for tailings transfer, head station and choke station facilities